Business
Oil Production Resumes At Ebendo Field
Production at the onshore Ebendo field in Nigeria has resumed after a damaged pipeline was repaired, Oando Energy Resources said in a statement.
The Tide source said that the 10-inch Kwale-Akri oil pipeline, operated by Nigerian Agip Oil Company, connects the field on Oil Mining Lease 56 to the Brass export terminal.
“The Kwale-Akri pipeline has been fully repaired and has commenced operations with reduced volumes being injected into the pipeline for testing, to ensure full integrity before full volume capacity is attained,” Oando said in a statement.
The field is currently producing about 2,000 barrels per day of oil. A “gradual ramp-up” over the next several weeks will bring output to 4,000 bpd “as full pipeline integrity is confirmed,” Oando said.
Prior to the shutdown, the pipeline was sending 4,600 bpd from two producing assets – Ebendo on OML 56 and the Abo field on OML 125.
The Abo field produces 3,225 bpd into a floating, production, storage and offloading unit and has not been affected by the pipeline disruptions, Oando said.
Nigerian private Energia operates the field with a 55 per cent stake. Oando owns a 42.75 per cent non-operated interest in it.
Business
NCDMB Signs Mgt Deal With Radisson, Edison…As Board’s 204 Rooms Hotel Open December 2026
Business
FG engages foreign investors at PEBEC Roundtable on business environment reforms
Business
MAN warns against illegal recycling of File photo
-
Business2 days agoNERC Amends Order on Meter Tampering, Power Bypass For Discos
-
News2 days agoPolice Arrest Nigerian, Two Others For Kidnapping In Edo
-
Business2 days agoNigeria, AFC sign $1.3 billion deal to build alumina refinery
-
Rivers2 days agoKENPOLY Rector Promises To Prioritise Students’ Welfare
-
Business2 days agoNCDMB Signs Mgt Deal With Radisson, Edison…As Board’s 204 Rooms Hotel Open December 2026
-
Rivers2 days agoDon, Stakeholders Urge Environmental Laws In N’Delta
-
Rivers2 days agoADIAFRICA Flags-off Free Eye Screening Outreach In PH
-
Environment2 days agoAEPB rates performance of waste evacuation contractors low
