Oil & Energy
Egbin Power Plant Plans 1,900MW Boost
A boost for electricity generation is on the horizon.
This indication comes on the heels of a planned additional 1,900 megawatt (MW) to the country’s power generation capacity by the Egbin Power Plant.
Its Chairman, Temitope Shonubi, made this known while unveiling expansion plans for the Egbin (Expansion) Phase 2 Investments, which is expected to add between 1,750MW and 1900MW to power generation.
Shonubi, conducting a delegation of the NNPC led by its Chief Operating Officer (COO), Gas and Power, NNPC, Yusuf Usman, an engineer, through the plant’s post-privatisation, said the plant has gone through major overhauling, which he said has helped to increase its generation from the low capacity it had before 2013.
“Egbin has 1,320 MW capacity. As at the time we took over, the plant was generating 300MW which is an abysmal 22 per cent. As at today, our generation capacity has surged and we do 89 per cent. We have reached 970 MW, the peak generation for the year and we are working hard to ensure sustainability of this feat. The 970MW we hit is the highest for the year and based on our core value of sustainability, we are working round the clock to make sure that we sustain the gains we have made,” Shonubi explained.
Listing challenges being faced by the company to include, grid limitation, gas constraints, and liquidity, Sonubi added that stakeholders, including the NNPC, Central Bank of Nigeria (CBN), and the Transmission Company of Nigeria (TCN) have been trying to solve the problems.
He called on the NNPC to keep exerting efforts towards gas development and supply of the product to keep turbines at Egbin working productively at optimal capacity.
Responding to the call and obviously satisfied with efforts put in so far in the thermal plant, Usman assured of the corporation’s commitment towards gas optimisation and supply for gas to power. He said NNPC will be joining the Egbin Power Plant to deepen gas supply for power generation.
He maintained that the NNPC was impressed with the turnaround at the thermal power station.
By: Tonye Nria-Dappa
Oil & Energy
MIND Slams PENGASSAN, Urges Senate Probe Over Alleged Maltreatment Of Nigerians At TotalEnergies
Oil & Energy
Elumelu Tasks FG On Power Sector Debt Payment
Oil & Energy
‘Over 86 Million Nigerians Without Electricity’
-
Sports4 days ago2026 WC: Nigeria, DR Congo Awaits FIFA Verdict Today
-
Politics4 days ago
ADC, PDP, LP Missing As INEC Set For By- Elections In Rivers
-
Environment4 days agoOxfam, partners celebrate 5 years of climate governance programmes in Nigeria
-
Politics4 days ago
FG’s Economic Policies Not Working – APC Chieftain
-
News4 days agoVictory Over Insurgency Certain, Tinubu Assures
-
Politics4 days ago2027: Diri Unveils RHA LG Coordinators, APC Congress Panel
-
Politics4 days agoReps To Meet,’Morrow Over INEC’s 2027 Election Timetable
-
Politics4 days agoGroup Continues Push For Real Time Election Results Transmission
