News
Nigeria Seeks EU Approval To Import Non-Hazardous Waste
The European Commission has received requests from Nigeria and 23 other non-members of the Organisation for Economic Cooperation and Development countries seeking inclusion in the list of nations eligible to import non-hazardous waste from the European Union.
Non-hazardous waste, which accounts for 95.6 per cent of solid waste produced in Europe, includes municipal waste such as packaging, clothing, bottles, and plastics, as well as demolition materials like concrete, bricks, stones, and food waste.
In a statement issued on Monday, the request was made in line with the new Waste Shipments Regulation, introduced as part of the EU’s Green Deal and Circular Economy Action Plan.
The regulation aims to establish stricter rules for the shipment of waste, including imports and exports between the EU and non-OECD countries. One key measure is the full ban on the export of plastic waste from the EU by November 2026.
Countries applying for eligibility to import non-hazardous waste must demonstrate their ability to manage these materials in an environmentally sound manner, with conditions that meet or exceed those of the EU.
The European Commission requires detailed information from the applicants to assess their readiness for this responsibility.
The countries that have submitted requests include Bangladesh, Bosnia and Herzegovina, Egypt, El Salvador, India, Indonesia, Kazakhstan, Malaysia, Moldova, Monaco, Morocco, North Macedonia, Pakistan, the Philippines, Saudi Arabia, Serbia, Singapore, Taiwan, Thailand, Togo, Tunisia, Ukraine, and Vietnam, alongside Nigeria.
“By that date, 24 requests were received for inclusion on the list of countries eligible to import non-hazardous waste from the EU after 21 May 2027 from Bangladesh, Bosnia and Herzegovina, Egypt, El Salvador, India, Indonesia, Kazakhstan, Malaysia, Moldova, Monaco, Morocco, Nigeria, North-Macedonia, Pakistan, Philippines, Saudi Arabia, Serbia, Singapore, Taiwan1, Thailand, Togo, Tunisia, Ukraine and Vietnam,” the EC said.
“The Commission will evaluate these applications and prepare a list of approved countries by November 2026. From May 2027 onwards, any country not included in this list will be prohibited from importing waste from the EU.
“However, countries that missed the February 2025 deadline can still submit requests, although there is no guarantee their assessment will be finalised before the first list is adopted.
“The first list of countries authorised to receive waste from the EU will be established by 21 November 2026. Exports of waste to non-OECD countries that are not included in the list will be prohibited from 21 May 2027. This list will be updated regularly and at least every two years.
“Countries that have not submitted a request by 21 February 2025 can still send one to the Commission. These requests will still be considered, but there is no guarantee that their assessment will be finalised before establishing the first list of countries authorised to import waste from the EU. This first list is planned for adoption in November 2026,” the statement concluded.
News
NGO-ATLANTIC-OYOROKOTO ROAD’LL UNLOCK COASTAL PROSPERITY FOR RIVERS – FUBARA
														Rivers State Governor, Sir Siminalayi Fubara, has described the ongoing construction of the brand new 13.52-kilometre Ngo-Atlantic-Oyorokoto Road as a bold and visionary effort by his administration to open up the coastal region for economic growth and harness the full potential of the state’s blue economy.
The Governor made this remark during an inspection visit to the project site in Andoni Local Government Area. The road, being constructed by Monier Construction Company (MCC), cuts through challenging coastal terrain and leads to a newly identified beachfront facing the Atlantic Ocean.
Governor Fubara explained that while the original plan was to construct a road leading to Oyorokoto Town and its popular beach, his administration decided to expand the project to create an entirely new route that would open access to another pristine beachfront.
“We are doing another inspection today. This particular one is a virgin road, 13.52 kilometres of a new pathway to the blue economy,” Governor Fubara stated.
“Initially, we were constructing a road to Oyorokoto Beach, one of the finest tourist centres in this area. But as we progressed, we discovered another beach directly facing the Atlantic Ocean. It became clear that we shouldn’t limit development to just one site. We want to harness this new beach front as part of our broader plan to develop the blue economy.”
The Governor emphasised that the project, once completed, will not only improve access to coastal communities but also stimulate tourism and economic activities, boosting revenue for Rivers State.
Describing the area’s difficult terrain as challenging, he commended the contractor for its dedication, and expressed confidence that the road would be completed and commissioned by March next year.
“You can see for yourself, it’s a brand-new road in a very difficult terrain, just like the one we saw yesterday. But I strongly believe we will overcome it. From what we’ve seen today, the contractor, MCC, is doing their best, and by next year, hopefully by March, we’ll have the cause to commission this project and give God all the glory,” the Governor affirmed.
Governor Fubara also visited Opobo/Nkoro Local Government Area to assess the progress of work on the Epellema axis of the ongoing 5.2km Kalaibiama-Epellema road project featuring a 450-meter bridge.
News
FUBARA HAILS PROGRESS OF WORK ON TRANS-KALABARI ROAD
														Rivers State Governor, Sir Siminalayi Fubara, has expressed satisfaction with the level of progress recorded on the ongoing Trans-Kalabari Road project, revealing that about 75 percent of the critical piling work has been completed.
Governor Fubara made this known while addressing journalists after an on-the-spot inspection of the 12.5-kilometre road project, which will connect the state capital to several Kalabari communities across the sea.
The Governor rode on a boat from a jetty at Rumuolumeni in Obio/Akpor Local Government Area through the rivers and creeks on the project route during the inspection.
The project was awarded to Lubrik Construction Company Limited, on May 15, 2024, with an initial 32-month completion timeline.
The Governor said the visit was aimed at verifying reports from the Ministry of Works regarding the project’s advancement. He commended the contractors for their dedication, and described the progress as “a true reflection of hard work and commitment to excellence.”
“The first phase of the project takes us to Bakana, and features four major river-crossing bridges and nearly five deck-on-pile structures. The terrain is difficult, and the engineering work required is complex. But to the glory of God, I can confirm that the reports I’ve been receiving are accurate. Almost 75% of the piling job, which is the most critical part of the project, has been achieved,” Governor Fubara said.
He emphasised that the Trans-Kalabari Road is one of the most technically demanding infrastructure projects in the state due to its challenging marine terrain but reaffirmed his administration’s resolve to deliver it on schedule.
Governor Fubara highlighted the strategic importance of the road in connecting the Kalabari Kingdom to Port Harcourt, and stimulating economic growth across riverine communities.
“This is a key project that will turn around the lives of the Kalabari people immediately it is concluded. By the grace of God, in the next six months, if we return here for inspection, we might be driving across the bridge,” he said.
Governor Fubara assured Rivers people that his administration remains focused on delivering transformative infrastructure projects that will improve lives and bring lasting development to rural communities.
“We have made a promise to our people to embark on projects that will change lives and bring development, and this is a testament to that commitment,” he added.
News
RSG EXPRESSES CONCERN OVER FLOODING IMPACT, EROSION
														The Governor of Rivers State, Sir Siminalayi Fubara, says that the impact of flooding and erosion on the inhabitants of Rivers State, especially those living in coastal communities, are of great concerns to the government.
Governor Fubara lamented the consequences of flood on both human and biotic life, which sometimes lead to loss of life, property, and degradation of the environment.
The Governor made the remark in Port Harcourt during the launch of a book titled, ‘Coastal Zone Flooding And Erosion in Developing Communities, Principles, Cases and Strategies,” written by Emeritus Prof. Wiston Bell-Gam.
According to the Governor, who was represented by the Secretary to the State Government, Hon. Benibo Anabraba, his administration, would continue to undertake and encourage adaptation strategies to combat flooding.
In his words: “The Rivers State Government will continue to undertake and encourage adaptation strategies, such as construction of seawalls and breakers, canals and channels, restoring coastal ecology and ecosystem for coastal resilience and where necessary, the relocation of communities on the coastline.
“These issues are currently receiving the much needed attention and intervention by the recent approval of the construction of shoreline protection along the coastlines of more than five communities in Ogba/Egbema/Ndoni and Opobo/Nkoro LGAs respectively.”
“It is important that as stakeholders in the protection and preservation of marine environment, we all act and advocate for mitigation strategies such as reduction in emission of Green House Gasses that causes climate change and rise in sea levels. Let us promote the use of clean energy and against fossil fuel.
Governor Fubara further cautioned residents to desist from building on waterways.
“We also need to encourage our people to stop developing buildings on and along natural water courses, indiscriminate sea mining and dredging activities on our coastline without consideration for mangroves and swamps,” he stressed.
He appreciated the author for his advanced contributions to the body of knowledge in both Rivers State and globally.
Also speaking, a former Military Governor of the old Rivers State and Amayanabo of Twon Brass, King Alfred Ditte-Spiff, who was Royal Father at the Event, stated that the book was timely to enable stakeholders manage the challenges of global warming.
“Global warming is real. If it’s not addressed globally, a time will come coastal areas will find themselves under water. The coastline of Nigeria is shocking with many mangroves gone,” he noted.
The Reviewer of the Book, who is also the Vice Chancellor of Olusegun Agagu University of Science and Technology, Ondo State, Prof Temi Ologunorisa, explained that the 14-chapter book is timeous as it fills literary gaps between desire and available knowledge on coastal flood and erosion in developing communities.,
“A major beauty of the book that sets it apart is the detailed consideration of flood and erosion control from around the world,” he stated, adding that the book is based on detailed field investigation.
- 
																	
										
																			News1 day agoIran vows to rebuild stronger nuclear sites
 - 
																	
										
																			Oil & Energy1 day agoFG Reaffirms Commitment To Brass Gas Project
 - 
																Rivers1 day ago
Group Urges Fubara To De-escalate Crisis In Emohua
 - 
																	
										
																			Sports1 day agoBayern Continue Bundesliga Dominance
 - 
																	
										
																			Business1 day agoItakpe Train Derailment: No Casualty Recorded — NRC
 - 
																	
										
																			News1 day agoWorld Bank to consider Nigeria’s fresh $1bn loan request
 - 
																	
										
																			Oil & Energy1 day agoFuel Import Duty: PETROAN Fears Monopoly In Oil Market, Urges Regulatory Checks
 - 
																	
										
																			Rivers1 day agoNLNG, NCDMB Launch ICT Hub To Boost Tech Skills In Nigeria
 
