Business
APM Terminals To Provide Container Weighing Services
The APM Terminals
Apapa Ltd., and West Africa Container Terminal (WACT), have installed controls to ensure containers loaded with a shipping line for export have valid Verified Gross Mass (VGM).
This is contained in a statement by the General Manager, Communication & Sustainability, APM Terminals, Nigeria, Mr Augustine Fischer, a copy of which was made available to our correspondent in Lagos.
The statement said that the new measure was in accordance with the International Maritime Organisation’s (IMO) Safety Of Life at Sea (SOLAS) Regulations.
According to the statement, APM Terminals has established SOLAS compliant Electronic Data Interchange capabilities with the shipping lines in Nigeria to share VGM information prior to vessel loading planning.
“The firm also has its weighing instruments verified by the Department of Weights and Measures of the Federal Ministry of Industry, Trade and Investment.
“In 2014, the International Maritime Organisation (IMO), the agency of the United Nations responsible for regulating international seaborne trade, approved amendments to the Safety of Life at Sea Convention which as of July 1,2016, will require verification and documentation of loaded containers before they can be loaded onto vessels.
“ This can be accomplished by either weighing the loaded container with calibrated and certified equipment or weighing the cargo prior to loading and adding it to the tare weight of the empty container.
The purpose of the VGM regulations is to assure safety of the vessel, as well as dockworkers and other cargo handlers by preventing overweight or otherwise misrepresented containers from jeopardising shipments or container movements,’’ Fischer said in the statement.
APM Terminals Head of Global Operations, Jack Craig said, “Our first priority remains to ensure safe and efficient operations for the supply chain.’’
According to Craig, it is crucial that these regulations are met in a way which does not create congestion bottlenecks that ultimately impose additional risk and cost for all stakeholders.
“Export containers which arrive at APM Terminal facilities without a valid VGM will be generally accepted but as they are ineligible to load on a vessel, may be segregated and subjected to additional re-handling and storage requirements,’’ our correspondent quotes the statement as saying.
Business
Boat Mishap Kills Pastor, Wife And Church Members In Brass Water
Business
Rivers Workers Seek Scrapping Of Contributory Pension Scheme
Business
FG Begins South-West Tour To Promote New Cooperative Bank
-
Editorial17 hours agoEnough Of Xenophobic Attacks On Nigerians
-
Nation16 hours agoRSU, Otonti Nduka Foundation Hold Centenary Conference, Unveil Book on Values in Nigeria
-
News22 hours agoFubara, Wife Hail Tinubu’s Renewed Hope Initiative …As Over 6,800 Families Benefit From Largesse In Rivers
-
Environment18 hours agoMOSOP – Tinubu Not Sincere With Ogoni People For Oil Resumption
-
Oil & Energy17 hours agoRivers PETROAN Elects 12-Member Executive
-
Politics18 hours ago
APC Group Protests Ex–Presidential Aspirant’s Disqualification From Rivers Senatorial Race
-
Maritime20 hours agoProducts, Others, To Arrive Lagos Ports Today — MPA
-
Politics18 hours ago
Reps Speaker Secures APC Return Ticket For Fifth Term
