Business
C’River Commissioner Inspects Road Projects

In fulfillment of the campaign promises of Governor Ben Ayade, the Cross River State Commissioner for Works, Engr. Dane Osim Asu, has embarked on an inspection of some road projects in the Central and Northern Senatorial Districts of the State.
Speaking at Boki East-West Road, the Commissioner noted that, the 27km road is a pet project of the Governor Ben Ayade-led administration, adding that the road is pre-historic and it links with Boje Bridge as well as other culvert and hills.
Hon. Osim- Asu disclosed that the project cost is N7.8 billion and the Ministry of Works has however, accepted to do it on direct labour for N3.1 billion. He pointed out that, there are three service providers that have identified interest to do the job and are already on site, maintaining that standard will not be compromised, as the project would be completed within five to seven months.
The Director of Civil, Engr. Godwin Akeke, said as a professional, there is no difficulty in the Boki-East-West Road stating that despite the fear of the people concerning the project, Government is well prepared for it.
According to him, the terrain may look difficult, but for a professional it as an easy project.
Engineer Akeke noted that the Governor is a man of action, when he gives directions, it must be carried out simultaneously, adding that, the Ministry of Works is determined to ensure that all materials used for the projects are certified for standard road construction.
The Director of Account, Ministry of Works, Mr. I. E. Egere said the project is highly commendable, noting that, he has seen practically where funds would be going to for the benefits of the State. He called on the Boki Community to rise up and support the State Government, as is an opportunity to build a better Cross River State and leave a legacy for the generation to come.
Earlier, the Commissioner also inspected the two kilometre Ishibori roads which spans from G.R.A and terminates at St. Thomas Primary School Ogoja, awarded to Messers Nig. Ltd. at 144m, informing that, it is a construction of urban renewal program aimed at providing access to Ogoja urban and expected to be completed within 3 months.
At Okuku Junction, the Director Civil gave details to the Commissioner of where the Mfon-Obanliku Road is expected to pass through. He noted that, the already existing road in Okuku needs expansion, adding that surveyors would work on the road which is also expected to link up with the Super Highway.
Speaking at Mfon Junction, Ogoja Local Government Area, the Commissioner charged the Sydney Construction Company to expedites action and ensure that the ongoing work he met on site continues speedily to achieve the expected result.
Hon. Osim-Asu commended the contractors on the high quality equipment he met on site and advised them to work hard and complete the project on or before 2018. He maintained that the government of Prof. Ben Ayade is passionate about the historical road and the welfare of the people, assuring that the project would be delivered on specifications.
Responding, the Community Chairman of Katabang, Boje ward in Boki Local Government Area, Mr. Mike Usang, Chief Martins Osang Women and Youths of Ogoja Local Government Area all commended Prof. Ben Ayade for the good gesture and pledged their support for him in 2019.
Friday Nwagbara, Calabar
Business
Kenyan Runners Dominate Berlin Marathons
Kenya made it a clean sweep at the Berlin Marathon with Sabastian Sawe winning the men’s race and Rosemary Wanjiru triumphing in the women’s.
Sawe finished in two hours, two minutes and 16 seconds to make it three wins in his first three marathons.
The 30-year-old, who was victorious at this year’s London Marathon, set a sizzling pace as he left the field behind and ran much of the race surrounded only by his pacesetters.
Japan’s Akasaki Akira came second after a powerful latter half of the race, finishing almost four minutes behind Sawe, while Ethiopia’s Chimdessa Debele followed in third.
“I did my best and I am happy for this performance,” said Sawe.
“I am so happy for this year. I felt well but you cannot change the weather. Next year will be better.”
Sawe had Kelvin Kiptum’s 2023 world record of 2:00:35 in his sights when he reached halfway in 1:00:12, but faded towards the end.
In the women’s race, Wanjiru sped away from the lead pack after 25 kilometers before finishing in 2:21:05.
Ethiopia’s Dera Dida followed three seconds behind Wanjiru, with Azmera Gebru, also of Ethiopia, coming third in 2:21:29.
Wanjiru’s time was 12 minutes slower than compatriot Ruth Chepng’etich’s world record of 2:09:56, which she set in Chicago in 2024.
Business
NIS Ends Decentralised Passport Production After 62 Years
Business
FG To Roll Out Digital Public Infrastructure, Data Exchange, Next Year
-
Sports5 days ago
CAFCL : Rivers United Arrives DR Congo
-
Sports5 days ago
FIFA rankings: S’Eagles drop Position, remain sixth in Africa
-
Sports5 days ago
NPFL club name Iorfa new GM
-
Sports5 days ago
NNL abolishes playoffs for NPFL promotion
-
Sports5 days ago
NSF: Early preparations begin for 2026 National Sports Festival
-
Sports5 days ago
Kwara Hopeful To Host Confed Cup in Ilorin
-
Sports5 days ago
RSG Award Renovation Work At Yakubu Gowon Stadium
-
Politics4 days ago
Rivers Assembly Resumes Sitting After Six-Month Suspension