Niger Delta
TCN Committed To Power Restoration In Calabar
The Transmission Company of Nigeria (TCN) has said its engineers are working assiduously to restore power supply to Calabar, after a substation was gutted by fire.
General Manager, Public Affairs, TCN, Mrs Ndidi Mbah, made this known in a statement in Abuja.
Mbah said the fire occurred on Saturday at its Adiabo 330/132/33 KiloVolt (kV) Substation in Cross River State.
“Presently, TCN engineers are replacing the affected equipment to ensure the restoration of power to affected areas.
“Supply will be restored as soon as equipment affected by the incident is replaced, most likely, Monday evening. Investigation into the cause of the incident is already ongoing,” she said.
The TCN apologised for every inconvenience to the government and electricity customers in the State, pledging to do all it could to ensure quick restoration of bulk supply to the area.
Niger Delta
850-bed UCTH overstretched, services 5m patients – CMD
Niger Delta
Police Burst Child Trafficking Syndicate In A’Ibom … Nab 3 Suspects
Niger Delta
A’Ibom Launches Operation Crack Down Scrap Dealers
-
Editorial11 hours agoEnough Of Xenophobic Attacks On Nigerians
-
Environment12 hours agoMOSOP – Tinubu Not Sincere With Ogoni People For Oil Resumption
-
Nation9 hours agoRSU, Otonti Nduka Foundation Hold Centenary Conference, Unveil Book on Values in Nigeria
-
News15 hours agoFubara, Wife Hail Tinubu’s Renewed Hope Initiative …As Over 6,800 Families Benefit From Largesse In Rivers
-
Oil & Energy10 hours agoRivers PETROAN Elects 12-Member Executive
-
Maritime13 hours agoProducts, Others, To Arrive Lagos Ports Today — MPA
-
Environment12 hours agoNGOs Task Media On Investing In Climate Literacy
-
Oil & Energy12 hours agoSEED: FG To Train 6,000 Energy Professionals
