News
No Gov Can Hijack PDP Structures -Wike
The Rivers State Governor, Chief Nyesom Wike has stated that no single governor can hijack the structures of the Peoples Democratic Party (PDP), saying those making insinuations to that effect are economical with the truth.
Speaking during a special appearance on Channels Television Sunrise Daily at the Government House, Port Harcourt, last Friday, Wike said all governors were equal and work in unity for the stability of the PDP.
Wike stated that no governor can control party affairs in another state, which is not within his jurisdiction.
He said: “All governors are equal in the party. There is no single governor that can finance a political party as big as the PDP”.
Speaking on comments credited to ex-President Olusegun Obasanjo, Wike said the former leader has left the PDP and destroyed his membership card, and wondered why Obasanjo was so interested in developments within the PDP.
The governor noted that the stability of the political party was not attained by financial muscle, but by the cooperation of all members.
Speaking further, the governor reiterated that the Independent National Electoral Commission (INEC) under the present circumstances lacks the capacity to conduct credible elections.
He added that beyond mere rhetoric, INEC should take concrete steps to convince Nigerians that they will improve on the conduct of elections.
Wike argued that the first step that INEC should take was to transparently investigate the printing of Fake INEC result sheets by Rivers APC chieftains.
The governor added that INEC should further explain how the police got original result sheets with same serial number of the Rivers East Senatorial District election, where INEC declared Senator George Sekibo winner, only for the police to tender a different result, relied upon by the court to declare APC winner in that election.
Commenting on the re-ordering of election sequence by the National Assembly, Wike said that he believes it was not targeted at the President as some APC leaders have argued.
On projects delivery in Rivers State, Wike maintained that he has instituted a system to do away with the era of abandoned projects which he inherited from his predecessor.
He added that the state government has reached out to all the 23 local government areas with meaningful projects and in other cases; he has completed projects abandoned by the Amaechi administration.
“I am guided to execute projects that will be completed in four years. I will not start any project that will be abandoned”, he said.
He stated that his administration was actively promoting women participation in government and also empowering women.
The governor noted that N500million has been set aside as an empowerment scheme for Rivers women.
He reiterated that he has not been reached through official channels on the visit of the president.
Wike noted that the communication line between the Presidency and the Rivers State Government is not through a press statement issued by Femi Adesina.
News
FG Awards Lagos-Abuja, Lagos-PH Super, Coastal Highway Contracts To AEC, Hitech
The Federal Government has unveiled plans to embark on a 460km superhighway project that would cut travel hours from Lagos to Abuja from about 14 hours to four-and-a-half hours and the Lagos-Port Harcourt Coastal Highway.
While the Abuja-Lagos Superhighway project was awarded to Advanced Engineering Consultants (AEC), the Lagos-Port Harcourt Coastal Highway was given to Hitech Construction Company Limited.
According to the Minister of Works, Engr. Dave Umahi, who addressed a press conference at Eko Signature Suites in Lagos on Saturday, September 23, the road would be built with concrete, not asphalt, and the construction through a Public Private Partnership (PPP) would be on a Build Operate and Transfer (BoT) arrangement with a consortium led by Advanced Engineering Consultants (AEC) under the chairmanship of Chief Kenny Martins.
Umahi announced that the highway running from Abuja through eight states to kiss the Fourth Mainland Bridge in Lagos will be completed in four years.
He said, “The President has approved that I should FastTrack this project.”
The minister said that at completion, an average vehicle traveling at 100km/hr could get to Lagos from Abuja in four and half hours.
“This is a journey that is more than 14 hours presently, so people found it hard to believe when this idea was introduced, but that is the Renewed Hope agenda of our divine President Bola Ahmed Tinubu. That is what God has brought him to do. He is the last hope for Nigeria, no matter what people say… Things that couldn’t have been done are being done under this administration… Nobody can fix Nigeria like Tinubu.
“This project is going to be two lanes, but the two lanes will be two carriageways – 14 meters; the only carriageway that is equivalent to this is the Third Mainland Bridge where each carriageway is 14 meters. It’s going to be built on 275-millimeter thick concrete… The lifespan will be 100 years. Bridges will be built and there will be tolling points.”
Umahi, who was accompanied by top officials from the Federal Ministry of Works and contractors, said, “We are here to FastTrack the development of the Greenfield of the PPP development under a new program of the Federal Ministry of Works which is the HDMI Programme (Highway Development and Management Initiative).
“Under this programme, there are two kinds, we have the Greenfield, and we have the Brown Field. The Greenfield is the one we are doing with the Advanced Engineering Company. They identified the project; they came up to discuss it with us; we threw the idea to the market; we invited investors; they made proposals… They won the bid to further engage us.”
The superhighway will pass through the FCT, Niger, Kogi, Kwara, Ekiti, Oyo, Ogun, and Lagos – Abuja, North-Central, and South-West.
Umahi said that the government would not put money into the project but would give the bid winners every support.
He commended the promoters of AEC, who he described as brilliant people.
“I’m very satisfied with their concept and what they have put in place. The next stage is to bring their business proposal so that we can negotiate on what the cost of the project will be. And then, they’ll go to the Ministry of Finance to negotiate the cost.
“We are building on concrete, so we can predict the cost; with asphalt, you cannot predict the cost. The cost of asphalt roads changes every month. Today, the dollar is almost a thousand naira. The oil price is almost $100 per barrel.
“Concrete roads are more durable and cheaper than asphalt. I’ve directed that the remaining jobs on all the ongoing projects that have not advanced up to 80percent must change to concrete.”
The minister also spoke on failed roads across the country putting the blame on civil servants.
He warned that any controller that allowed trucks to fall on the road under his supervision would go on indefinite suspension, and the director in that region would be recalled.
He said, “Hold civil servants responsible for failure of road projects. Civil servants in other parts of the country apart from Lagos stay in the office and issue certificates to contractors.
“I’ve inspected roads in South-West and South-East. I spent 14 hours traveling from Abuja to Benin. I had pains, and I was so happy having the pains because Nigerians are going through the pains on a daily basis.”
Umahi also blamed the failed road projects across the country on lack of supervision; “contractors took money and didn’t do the work. They constructed failed roads. Roads that could not stand three years. They could not even maintain the roads. Trucks are falling. Travelers pass through communities. People are being kidnapped. I went to Warri. I went to Bayelsa, the story is the same.
“In every contract, there’s provision to maintain the roads. If a contractor is greedy to take a project of 150km that should go to three contractors, he should be prepared to maintain it. I’ve created a platform where I have all the contractors and the directors inside. Everybody is back to work. It’s the directive of Mr. President. He said that he must not see vehicles falling on highways again. I will get whoever flouts the directive out of the way.
“I have just informed Mr President that in 30 days if no urgent attention is given to the road, nobody will pass from Bayelsa or Port Harcourt to Warri. And that is very dangerous. So, he directed that I should go and inspect the roads and bring comprehensive information on what should be done immediately.
“He is a man who listens. He’s in a hurry to solve people’s problems in this country. He’s very much in a hurry to change the story. From Bayelsa, I went to Port Harcourt, to Akwa Ibom, to Cross River, and from there I flew to Enugu yesterday evening by 6 o’clock to discuss this road matter with the governor of Enugu State.
“I’m also to reinspect the Third Mainland Bridge and start work on it immediately, and then discuss with the Ogun State governor on the HDMI.”
Fielding questions from reporters on challenges that PPP projects have been facing in Nigeria, Umahi said that things would be different this time.
“We will tie ourselves very well with irrevocable agreement. On the issue of Right of Way, they own the entire land until they recover the money invested. If the Federal Government reneges, they have to pluck their investment directly from the Federation Account.
“If the investment must work, it must not be subjected to political dynamism. It has to be a business venture. That’s why I like President Bola Tinubu. He inherited 18,000 km of roads, and 2,640 projects; there are still constituency projects that are over another 2,000 in number. So, you have over 64,664 Federal Government projects that are ongoing.
“He has not stopped any contractor. He wants to complete all those things. Certain leaders will say we want to do our own, that is gross irresponsibility.
“They (bid winners) are going to give me a letter of comfort; if they back out, they must pay us $10million. My coming here is at a cost, and nobody should waste our time.”
In his response, Chief Kenny Martins assured that the road would be the first of its kind with communication cyber cable, rail lines, and coastal areas.
“The road will be ICT complaint so that electronic vehicles can operate on the road; there will be all kinds of security and there will be solar lights, the whole 460kilometres of the road,” he said.
The minister also mentioned that the Federal Government is working to actualise another project, the Lagos-Port Harcourt Coastal Highway.
He said that Hitech Construction would fund the project under the PPP model.
Hitech is a division of the Chagoury Group, a business conglomerate in Lagos that oversaw the construction of the Lekki-Epe expressway and the Ajah flyover.
Umahi added that upon completion, the highway would have multiple spurs connecting major towns and cities, including a spur connecting Ogoja-Ikom-Cameroon Road.
“There will be a spur that will connect the proposed fourth mainland bridge in Lagos,” he said.
“It is also connected to the deep seaport road being constructed by Hitech, under the concrete technology and it is also connected at Lagos-Badagry to the proposed Lagos-Abidjan superhighway.”
He said there would also be multiple connections with roads leading to the northern parts of the country.
“There is a proposal for connection to Sokoto. I think about four to five connections to northern Nigeria,” he said.
Umahi described the project as a brainchild of President Tinubu, who asked him to also “fast track this project because it is going to be a catalyst towards the economic development of this country.
“Let me announce that it is under PPP. The Hitech Group is going to look for the money. They have already found the money and that is the good news because we don’t waste our time talking and holding meetings and wasting resources,” he said.
“We are engaging seriously because we have seen the financial capacity and capability of Hitech and this project is going to be delivered in phases.
“Any section that we complete, we will toll it, and then business and transportation will start.
“The right of way of this project is about a 100-meter corridor. There is provision for a rail line in the middle of the road which is about 20 meters.
“The road has four carriageways. Each of the service lanes is 10 meters wide. The main carriageway is 14 meters.”
News
FG Awards Lagos-Abuja, Lagos-PH Super, Coastal Highway Contracts To AEC, Hitech

The Federal Government has unveiled plans to embark on a 460km superhighway project that would cut travel hours from Lagos to Abuja from about 14 hours to four-and-a-half hours and the Lagos-Port Harcourt Coastal Highway.
While the Abuja-Lagos Superhighway project was awarded to Advanced Engineering Consultants (AEC), the Lagos-Port Harcourt Coastal Highway was given to Hitech Construction Company Limited.
According to the Minister of Works, Engr. Dave Umahi, who addressed a press conference at Eko Signature Suites in Lagos on Saturday, September 23, the road would be built with concrete, not asphalt, and the construction through a Public Private Partnership (PPP) would be on a Build Operate and Transfer (BoT) arrangement with a consortium led by Advanced Engineering Consultants (AEC) under the chairmanship of Chief Kenny Martins.
Umahi announced that the highway running from Abuja through eight states to kiss the Fourth Mainland Bridge in Lagos will be completed in four years.
He said, “The President has approved that I should FastTrack this project.”
The minister said that at completion, an average vehicle traveling at 100km/hr could get to Lagos from Abuja in four and half hours.
“This is a journey that is more than 14 hours presently, so people found it hard to believe when this idea was introduced, but that is the Renewed Hope agenda of our divine President Bola Ahmed Tinubu. That is what God has brought him to do. He is the last hope for Nigeria, no matter what people say… Things that couldn’t have been done are being done under this administration… Nobody can fix Nigeria like Tinubu.
“This project is going to be two lanes, but the two lanes will be two carriageways – 14 meters; the only carriageway that is equivalent to this is the Third Mainland Bridge where each carriageway is 14 meters. It’s going to be built on 275-millimeter thick concrete… The lifespan will be 100 years. Bridges will be built and there will be tolling points.”
Umahi, who was accompanied by top officials from the Federal Ministry of Works and contractors, said, “We are here to FastTrack the development of the Greenfield of the PPP development under a new program of the Federal Ministry of Works which is the HDMI Programme (Highway Development and Management Initiative).
“Under this programme, there are two kinds, we have the Greenfield, and we have the Brown Field. The Greenfield is the one we are doing with the Advanced Engineering Company. They identified the project; they came up to discuss it with us; we threw the idea to the market; we invited investors; they made proposals… They won the bid to further engage us.”
The superhighway will pass through the FCT, Niger, Kogi, Kwara, Ekiti, Oyo, Ogun, and Lagos – Abuja, North-Central, and South-West.
Umahi said that the government would not put money into the project but would give the bid winners every support.
He commended the promoters of AEC, who he described as brilliant people.
“I’m very satisfied with their concept and what they have put in place. The next stage is to bring their business proposal so that we can negotiate on what the cost of the project will be. And then, they’ll go to the Ministry of Finance to negotiate the cost.
“We are building on concrete, so we can predict the cost; with asphalt, you cannot predict the cost. The cost of asphalt roads changes every month. Today, the dollar is almost a thousand naira. The oil price is almost $100 per barrel.
“Concrete roads are more durable and cheaper than asphalt. I’ve directed that the remaining jobs on all the ongoing projects that have not advanced up to 80percent must change to concrete.”
The minister also spoke on failed roads across the country putting the blame on civil servants.
He warned that any controller that allowed trucks to fall on the road under his supervision would go on indefinite suspension, and the director in that region would be recalled.
He said, “Hold civil servants responsible for failure of road projects. Civil servants in other parts of the country apart from Lagos stay in the office and issue certificates to contractors.
“I’ve inspected roads in South-West and South-East. I spent 14 hours traveling from Abuja to Benin. I had pains, and I was so happy having the pains because Nigerians are going through the pains on a daily basis.”
Umahi also blamed the failed road projects across the country on lack of supervision; “contractors took money and didn’t do the work. They constructed failed roads. Roads that could not stand three years. They could not even maintain the roads. Trucks are falling. Travelers pass through communities. People are being kidnapped. I went to Warri. I went to Bayelsa, the story is the same.
“In every contract, there’s provision to maintain the roads. If a contractor is greedy to take a project of 150km that should go to three contractors, he should be prepared to maintain it. I’ve created a platform where I have all the contractors and the directors inside. Everybody is back to work. It’s the directive of Mr. President. He said that he must not see vehicles falling on highways again. I will get whoever flouts the directive out of the way.
“I have just informed Mr President that in 30 days if no urgent attention is given to the road, nobody will pass from Bayelsa or Port Harcourt to Warri. And that is very dangerous. So, he directed that I should go and inspect the roads and bring comprehensive information on what should be done immediately.
“He is a man who listens. He’s in a hurry to solve people’s problems in this country. He’s very much in a hurry to change the story. From Bayelsa, I went to Port Harcourt, to Akwa Ibom, to Cross River, and from there I flew to Enugu yesterday evening by 6 o’clock to discuss this road matter with the governor of Enugu State.
“I’m also to reinspect the Third Mainland Bridge and start work on it immediately, and then discuss with the Ogun State governor on the HDMI.”
Fielding questions from reporters on challenges that PPP projects have been facing in Nigeria, Umahi said that things would be different this time.
“We will tie ourselves very well with irrevocable agreement. On the issue of Right of Way, they own the entire land until they recover the money invested. If the Federal Government reneges, they have to pluck their investment directly from the Federation Account.
“If the investment must work, it must not be subjected to political dynamism. It has to be a business venture. That’s why I like President Bola Tinubu. He inherited 18,000 km of roads, and 2,640 projects; there are still constituency projects that are over another 2,000 in number. So, you have over 64,664 Federal Government projects that are ongoing.
“He has not stopped any contractor. He wants to complete all those things. Certain leaders will say we want to do our own, that is gross irresponsibility.
“They (bid winners) are going to give me a letter of comfort; if they back out, they must pay us $10million. My coming here is at a cost, and nobody should waste our time.”
In his response, Chief Kenny Martins assured that the road would be the first of its kind with communication cyber cable, rail lines, and coastal areas.
“The road will be ICT complaint so that electronic vehicles can operate on the road; there will be all kinds of security and there will be solar lights, the whole 460kilometres of the road,” he said.
The minister also mentioned that the Federal Government is working to actualise another project, the Lagos-Port Harcourt Coastal Highway.
He said that Hitech Construction would fund the project under the PPP model.
Hitech is a division of the Chagoury Group, a business conglomerate in Lagos that oversaw the construction of the Lekki-Epe expressway and the Ajah flyover.
Umahi added that upon completion, the highway would have multiple spurs connecting major towns and cities, including a spur connecting Ogoja-Ikom-Cameroon Road.
“There will be a spur that will connect the proposed fourth mainland bridge in Lagos,” he said.
“It is also connected to the deep seaport road being constructed by Hitech, under the concrete technology and it is also connected at Lagos-Badagry to the proposed Lagos-Abidjan superhighway.”
He said there would also be multiple connections with roads leading to the northern parts of the country.
“There is a proposal for connection to Sokoto. I think about four to five connections to northern Nigeria,” he said.
Umahi described the project as a brainchild of President Tinubu, who asked him to also “fast track this project because it is going to be a catalyst towards the economic development of this country.
“Let me announce that it is under PPP. The Hitech Group is going to look for the money. They have already found the money and that is the good news because we don’t waste our time talking and holding meetings and wasting resources,” he said.
“We are engaging seriously because we have seen the financial capacity and capability of Hitech and this project is going to be delivered in phases.
“Any section that we complete, we will toll it, and then business and transportation will start.
“The right of way of this project is about a 100-meter corridor. There is provision for a rail line in the middle of the road which is about 20 meters.
“The road has four carriageways. Each of the service lanes is 10 meters wide. The main carriageway is 14 meters.”
News
Reps Resume Plenary On Tuesday

The House of Representatives has said it would resume from its annual recess on Tuesday to continue the first legislative year of the 10th Assembly.
The Clerk of the House, Dr Yahaha Danzaria, said this in a statement in Abuja on Saturday.
The 10th Assembly proceeded on its annual recess on July 27.
This followed a plenary session during which Speaker, Hon Tajudeen Abbas, announced the leadership of the standing committees of the house.
Commenting on the resumption, the Spokesperson of the House and House Committee on Media and Public Affairs, Hon Akin Rotimi, said the 10th Assembly had been prolific.
He said since its inauguration, the house had recorded 470 bills, with all passing first reading, while four passed second reading.
He added that there had been 175 motions considered by the parliament.
He said in spite of the recess, it had continued to function, as various ad hoc committees continued to carry out their crucial mandates.
He said this had generated significant positive public interest.
Rotimi said some of the key early developments expected on resumption was the conclusion of the work of all ad-hoc committees and the submission of their reports.
He said this was for the consideration of the House in line with the directive of the speaker.
He said the house would get the final draft of its Legislative Agenda developed by the ad hoc committee, led by the Majority Leader, Hon Julius Inhonvbere.
He said it would be considered and adopted by the house, adding that the draft agenda was developed following extensive consultations with critical stakeholders.
He also said that the membership of the standing committees would be announced and fully constituted.
-
Niger Delta4 days ago
HCD Charges Journalists On Adequate Reportage
-
News4 days ago
Protests Rock Ghana Over Economic Hardships
-
Environment4 days ago
Stakeholders Call For Shore Protection For Bille Community
-
Politics4 days ago
Tani Olorun Not Against Out-Of-Court Settlement, Says Lawyer
-
News4 days ago
Asset Concession To Generate N185.2bn Revenue – ICRC
-
News4 days ago
FG Awards Lagos-Abuja, Lagos-PH Super, Coastal Highway Contracts To AEC, Hitech
-
Rivers4 days ago
NSCDC Uncovers Illegal Refining Site In Rivers
-
News4 days ago
Tinubu Orders Security Agencies To Rescue Abducted Zamfara Female Varsity Students